ImproveBayArea / SF Building Inspection
← Back to dashboard
Complaint

#202663189

Date last observed: 25-sep-26; time last observed: 2 pm; floor: 5; unit: 56; exa
Filed

Location

Parcel 0272001A · Nob Hill · Supervisor District 3

Status timeline

  1. Sep 28, 2026 Filed

Description

Date last observed: 25-sep-26; time last observed: 2 pm; floor: 5; unit: 56; exact location: main bldg; building type: residence/dwelling no heat; ; additional information: building central boiler/radiator heat is not functioning. i first reported the lack of heat to management on september 22. on september 24, management notified residents that the boiler has reached the point where it needs replacement, that contractor bids are still being obtained, and that no replacement schedule or completion date has yet been established. my unit therefore currently lacks functioning radiator heat, and the apartment has been extremely cold. please inspect for compliance with the applicable housing code heating requirements and determine what interim measures are required while the boiler replacement is pending.;

Inspection details

Division: Housing Inspection Services
Status: Active

Source: DataSF gm2e-bten — DataSF Building Complaints dataset, refreshed daily.

Data on this page was assembled . A copy may be served for up to 1 minutes after that.